Kur- und Gradier-Therme, Bad Wilsnack

Bad_Wilsnack2

Services

  • New construction of a combined heat and power plant (CHP) including buffer storage and hydraulic and electrical integration, conversion of natural gas into useful energy (lighting, kinetic energy);
  • Significant improvement in efficiency
  • Operation, maintenance, and service
  • 24/7 emergency and fault elimination service

Project results

  • Energy savings through the new construction of a CHP plant, which ensures a high utilization of primary energy input and efficient conversion into useful energy
  • The system is equipped with a 20,000 liter buffer storage as well as new speed-controlled pumps and a higher-level control
  • Control strategy allows priority operation of the CHP and reduction of peaks in power purchasing
  • Building management technology provides optimized operation of technical installations as well as the perquisites for 24/7 monitoring operation for emergencies
  • Long-term success of achieved savings through monitoring and implementation of a sustainable energy management system