Project scope
- Thermal and saltwater baths with sauna, wellness area, saltwater lake, restaurant/kitchen, and (brine) graduation works
- Investment: 395,000 Euro
- Operation and maintenance of CHP plant (323 kW electricity, 485 kW heat)
- Term of Contract: 10 years
- Total Savings: 23 % lower energy costs
- Reduction of CO2 emissions: approx. 950 metric tons per year
Services
- New construction of a combined heat and power plant (CHP) including buffer storage and hydraulic and electrical integration, conversion of natural gas into useful energy (lighting, kinetic energy);
- Significant improvement in efficiency
- Operation, maintenance, and service
- 24/7 emergency and fault elimination service
Project results
- Energy savings through the new construction of a CHP plant, which ensures a high utilization of primary energy input and efficient conversion into useful energy
- The system is equipped with a 20,000 liter buffer storage as well as new speed-controlled pumps and a higher-level control
- Control strategy allows priority operation of the CHP and reduction of peaks in power purchasing
- Building management technology provides optimized operation of technical installations as well as the perquisites for 24/7 monitoring operation for emergencies
- Long-term success of achieved savings through monitoring and implementation of a sustainable energy management system