Project scope
- Total costs: 34 million Euro
 
- TBE costs: 17 million Euro
 
- Usable floor area: 10,872 m²
 
     
    
        Services
- Technical master planning for system groups 1 – 8 according to § 51 HOAI (2009)
 
- Performance phases 2 – 8
 
     
 
    
        
    
Project results
    
        
    
- New construction of a high-tech surgery center as the core of a future medical center that also serves as a milestone in the development of the hospital of the future in Schleswig Holstein
 
- Creation of a central surgery area with 8 operating rooms, 12 recovery beds, 6 IMC beds, as well as 4 nursing wards with 36 beds each
 
- Special feature: Class A clean rooms (UDAF)
 
- Through the use of unidirectional air flow ceilings (UDAF) and the pre-equipment for a digital surgery management system, the most modern operating rooms in Europe were established here.
 
- Application of the latest heat recovery technology combined with recooling for refrigeration significantly increases the energy efficiency of the building
 
- Conveyor technology as expansion of the existing automated transport system (ATS) (electric suspended monorail) and elevators (1.2 million Euro)
 
- Review of existing systems, planning, conceptualization, bidding process, and construction for expansion of ATS as suspended monorail