PROJECT SCOPE
- Adventure pool, thermal bath with wave pool, soda pool, sauna area, wellness area, restaurant/kitchen, and outdoor swimming pool
- Investment: 371,000 Euro
- Operation and maintenance of CHP plant (323 kW electricity., 485 kW heat)
- Term of contract: 10 years
- Total savings: 21 % lower energy costs
- Reduction of CO2 emissions: approx. 890 metric tons per year
SERVICES
- Construction of a combined heat and power plant (CHP) including buffer storage and hydraulic and electrical integration
- Conversion of natural gas into useful energy (lighting, kinetic energy)
- Operation, maintenance, and service
- 24/7 emergency and fault elimination service
Project results
- Energy savings through the new construction of a CHP plant, which ensures high utilization of the primary energy input and efficient conversion into useful energy
- The system is equipped with a 20,000 liter buffer storage as well as new speed-controlled pumps and a higher-level control; control strategy allows priority operation of the CHP and reduction of peaks in power purchasing
- Optimized operation of technical installations as well as the perquisites for a 24/7 monitoring operation for emergencies based on building management technology
- Assurance of long-term success by monitoring of achieved savings through a sustainable energy management system