BILDER
1/1

Energy audit according to DIN EN 16247-1 for mouldtec Kunststofftechnik GmbH in Kaufbeuren

Mouldtec1

Services

  • Execution of an energy audit according to DIN 16247-1 with identification of tangible potentials for energy savings
  • Derivation of measures to attain potentials in energy efficiency for process and cross-sectional technologies
  • Project duration: July 2013 to September 2013

Project results

Within the scope of the audit, the company’s current energy situation was recorded and evaluated, and the pattern of energy consumption was graphed. Subsequently, the efficiency of energy applications was assessed and production processes were evaluated. This required definition and representation of the starting base and the definition and derivation of applicable energy performance indicators. The audit showed a total of 14 concrete potentials for energy efficiency, especially in the area of injection molding machines.

Diese Webseite verwendet Cookies. Datenschutzhinweise hier