Project scope
- Total costs: 24 million Euro
- TBE costs: 8.5 million Euro
- NFA: 11,412 m²
Services
- Technical master planning of system groups 1 – 3 and 6 – 8 according to § 51 HOAI (2009)
- Performance phases 2 – 8
Project results
- Construction of a new hospital with 144 beds, four operating rooms
as well as the necessary examination and treatment areas
64 patient baths as wet room areas
- Central hot water supply including protection against Legionnaires’ disease
- Kitchen equipment for the preparation of 500 meals
Laundry
- Central heating system, district heating 750 kW, 400 panel radiators
- Two central ventilation systems in roof facilities with a total air volume of
approx. 70,000 m³/h
- Central building automation with approx. 1,000 datapoints