Services

  • Technical master planning of system groups 1 – 3 and 6 – 8 according to § 51 HOAI (2009)
  • Performance phases 2 – 8

Project results

  • Construction of a new hospital with 144 beds, four operating rooms
    as well as the necessary examination and treatment areas
    64 patient baths as wet room areas
  • Central hot water supply including protection against Legionnaires’ disease
  • Kitchen equipment for the preparation of 500 meals
    Laundry
  • Central heating system, district heating 750 kW, 400 panel radiators
  • Two central ventilation systems in roof facilities with a total air volume of
    approx. 70,000 m³/h
  • Central building automation with approx. 1,000 datapoints